Offshore Shipping Online

A publication for the offshore shipping industry published by Clarkson Research

  • Offshore Intelligence Monthly
  • Menu

    Bluewater to upgrade of Glas Dowr FPSO

    News // March 15, 2002
    Bluewater Energy Services has awarded a contract to SA Five Engineering (Pty) Ltd in South Africa for the upgrade of the FPSO Glas Dowr. After the modifications are completed, the Glas Dowr will operate in the Sable Field in the Bredasdorp basin off South Africa.

    The upgrade work to be executed by SA Five Engineering (Pty) Ltd. in Cape Town will include the fabrication and installation of a gas compression module, process separation module, flare structure and various modifications to the existing topside facilities of the FPSO. The upgrade work on the FPSO is scheduled for completion by mid October 2002.

    More articles from this category

    More news