Swire Pacific Offshore takes delivery of turbine installer

Vessel & ROV News - August 1, 2012

| More

Swire Pacific Offshore Operations (Pte) Ltd (SPO), the parent company of Swire Blue Ocean A/S, took delivery on Friday 27th July of Pacific Orca, which it describes as the world's largest windfarm installation vessel (WIV). The vessel was built bySamsung Heavy Industries (SHI).

The vessel will be deployed to provide service for the Danish utility company DONG Energy.

The vessel's particulars include a length of 161m, a breadth of 49m and a depth of 10.4m.The vesselcan carry123.6 MW wind turbine generators.

Pacific Orca can install offshore wind foundations and WTGs in ocean depths of up to 60m.

More articles from this category

More news

Categories

Product Guide

News Letter

Fill in your name, company and e-mail address below for our bi-weekly newsletter.

Subscribe
Unsubscribe

Clarksons

Powered by MARIS.

Subscribe to Offshore Shipping News Online RSS

Follow Offshore Shipping News Online on Twitter

Subscribe to email updates

Sponsors

sponsorsponsorsponsor

Events

9th Deepwater China Convention 2014
24-25 April 2014
China, Shenzhen.

FPSO Topsides Design and Layout
29-30 April 2014
United kingdom, London.

Subsea Vessels Conference
29-30 April 2014
Norway, Oslo.

OSV Chartering Contract Management Middle East
29-30 April 2014
United arab emirates, Dubai.

Subsea Power Cables
30 April-01 May 2014
United kingdom, London.

More events