Trendsetter Engineering has announced the completion of an Arctic Capping Stack (ACS). The ACS is an integral part of Shell’s Oil Spill Response Plans for the Chukchi and Beaufort Seas.

The ACS adheres to Bureau of Safety and Environmental Enforcement (BSEE) requirements. The design is such that it can be used as an emergency pressure containing device that acts as a barrier in the extremely unlikely event of a BOP failure.

Arctic weather and environmental extremes, encountered both at the frigid seafloor and in the air, mandate specialized design, engineering, and function requirements for the ACS to be effective - the operations will also be performed in shallow water depths (200 fsw).

“The ACS was shipped in truckable modules to Portland, OR and was restacked in less than two days. This kind of quick response is imperative should deployment become necessary,” said Mauricio Madrid, Project Manager at the company.

Built with ROV interfaces, the ACS is ROV-operable and capable of capturing / processing 100,000 barrels of fluid per day, with onboard accumulation for rapid well control. The equipment's design life is 20 years.

 

More articles from this category

More news

Categories

Product Guide

News Letter

Fill in your name, company and e-mail address below for our bi-weekly newsletter.

Subscribe
Unsubscribe

Clarksons

Powered by MARIS.

Subscribe to Offshore Shipping News Online RSS

Follow Offshore Shipping News Online on Twitter

Subscribe to email updates

Sponsors

sponsorsponsorsponsor

Events

Offshore Marine Crewing
01-02 October 2014
Norway, Oslo.

FPSO Training Course Amsterdam
06-08 October 2014
Netherlands, Amsterdam.

Kuwait Oil and Gas Show and Confernce
12-15 October 2014
Kuwait, Kuwait.

Myanmar- Oil and Gas 2014
15-17 October 2014
Myanmar, Yangon.

Offshore Support Vessel Conference
20-21 October 2014
Norway, Oslo.

More events