Wärtsilä to power six new pipelay vessels

Equipment & Technology - July 4, 2012

| More

Wärtsilä has been contracted to supply integrated power solutions to six new offshore Pipe Laying Vessels (PLVs) being built for operation in Brazilian waters. The majority of these orders have been booked before the second quarter of 2012.

The PLVs will be operating for the Brazilian multinational corporation Petrobras, one of the world's leading energy companies, for the construction of pipelines from offshore oil rigs to the mainland. The six vessels are to be built by three different companies at yards in the Netherlands, Brazil and South Korea.

The Wärtsilä solutions selected for the six vessels include design, main engines, and propellers and will be delivered during the fourth quarter of 2012 and the first quarter of 2013. The first vessels are scheduled to be launched in 2014, with all six to be fully operable before the end of 2015.

"We have been selected to supply all six vessels in the tender, for which the owners, shipyards, and even the design are different," says Magnus Miemois, Vice President Ship Power Offshore.

"This is a notable achievement for a number of reasons. In the first place, it is recognition of Wärtsilä's experience and expertise in supplying high quality, reliable, and efficient integrated solutions.

"These contracts also strengthen Wärtsilä's installed base in Brazil."

Detailed scope of supply:

• The two PLVs to be built for a France-based joint venture between Technip and Odebrecht Oleo & Gas (OOG) at the Daewoo Shipbuilding & Marine Engineering (DSME) yard in South Korea, will utilize a Wärtsilä Ship Design (WSD) VS4146 design. For each of these vessels, Wärtsilä will also supply three Wärtsilä Modular Thrusters (LMT), two retractable thrusters, and two tunnel thrusters (TT).

• For the 550 ton PLV ordered by Subsea7 in the UK, that is to be designed and built by IHC Merwede, Wärtsilä will supply six Wärtsilä 32 in-line engines, three Wärtsilä Modular Thrusters, two retractable thrusters, and two tunnel thrusters.

• For the two 550 ton PLVS that the Malaysian company, Sapura Crest Petroleum Bhd will build at the IHC Merwede shipyard in the Netherlands, Wärtsilä will supply six Wärtsilä 32 in-line engines, three Lips Modular thrusters, two retractable thrusters, and two tunnel thrusters.

• For the 300 ton PLV that the same company will build at the OSX Construcao Naval yard in Brazil, Wärtsilä will supply four Wärtsilä 32 in-line engines, three Wärtsilä Compact Thrusters (LCT) for primary propulsion, one retractable thruster, and two tunnel thrusters.

More articles from this category

More news

Categories

Product Guide

News Letter

Fill in your name, company and e-mail address below for our bi-weekly newsletter.

Subscribe
Unsubscribe

Clarksons

Powered by MARIS.

Subscribe to Offshore Shipping News Online RSS

Follow Offshore Shipping News Online on Twitter

Subscribe to email updates

Sponsors

sponsorsponsorsponsor

Events

9th Deepwater China Convention 2014
24-25 April 2014
China, Shenzhen.

FPSO Topsides Design and Layout
29-30 April 2014
United kingdom, London.

Subsea Vessels Conference
29-30 April 2014
Norway, Oslo.

OSV Chartering Contract Management Middle East
29-30 April 2014
United arab emirates, Dubai.

Subsea Power Cables
30 April-01 May 2014
United kingdom, London.

More events