Offshore Shipping Online

A publication for the offshore shipping industry published by Clarkson Research

  • Offshore Intelligence Monthly
  • Menu

    Oceaneering installs jumper spools in deep water

    Projects and Operations // July 9, 2004
    Working from the DP-2 MSV Ocean Intervention II, Oceaneering has installed two hard line jumper spools on deepwater wells at depths greater than 7,500ft.

    The jumpers connect two Mississippi Canyon wells to a host platform in the Gulf of Mexico.

    The project also included testing the jumpers and installing multiple steel tube and electrical flying leads.

    Oceaneering has now installed 18 jumper spools in water depths of greater than 3,000ft.

    More articles from this category

    More news