Offshore Shipping Online

A publication for the offshore shipping industry published by Clarkson Research

  • Offshore Intelligence Monthly
  • Menu

    First foundation installed at London Array

    Projects and Operations // March 22, 2011

    The first of 177 foundations has been installed at the London Array offshore windfarm. 

    The monopile, weighing around 268 tonnes, was supplied and installed by joint venture company Per Arsleff Bilfinger Berger Ingeniurbeu GmBH using A2SEAís jack-up barge, Seaworker. 

    The transition piece was then lifted into place, completing the projectís first full foundation installation.

    Foundations will continue to arraive and be installed in a pre-determined patter, each one having been designed and built specifically for its installation location.

    More articles from this category

    More news